How and what to turn on when preparing to run a service.
Steps:
Important: The order of operations when power cycling the components at FOH is critical to maintaining and protecting the equipment. Power applied in the wrong order can lead to damage to equipment, and hearing loss.
Note: We currently have no way to shut down the active mains and sub-woofers. A plan is in place to solve this problem in the future to prevent audio spikes to the mains.
- Turn on all wireless microphone receivers.
- Ensure any ME-1 personal monitoring stations that are daisy chained (if applicable) are also connected to power. [currently none are chained]
- Turn on the ME-U personal monitor HUB on stage if it is not already on.
- Turn on the QU-32 FOH Console.